OM-ELA (Van's RV-10 builder's log)

(stavebný denník lietadla Van's RV-10 S/N 41519)

4.10.2021 Pitot Static Leak Test

28/07/2022supikLeave a comment
smart

smart

smart

smart

smart

smart

smart

smart

smart

smart

PITOT STATIC SYSTEM

3.10.2021 Interior Door Handle

28/07/2022supikLeave a comment
20211002_190135

smart

smart

smart

smart

Misc

2.10.2021 Front Seat Belts & Shoulder Harness

28/07/202228/07/2022supikLeave a comment

Front Seat Belts & Shoulder Harness installed. Rear Headrests ready for installation..

20211004_181026

20211002_185354

20211002_185256

20211002_164730

20211002_164534

20211002_161710

PAINT / FURNISHING / UPHOLSTERY

2.10.2021 Roll Servo has failed

28/07/202228/07/2022supikLeave a comment

The Roll Servo has failed. Pulled out for replacement..

smart

20210910_193031

20210910_183442

20210910_122317

ELECTRICAL & AVIONICS

9.9.2021 Right Instrument Panel with Labels

28/07/202228/07/2022supikLeave a comment
20211002_185156

20211002_185124

20211002_185105

20211002_184955

20211002_183823

20211002_183737

20211002_183647

20211002_162801

20211002_154159

20210910_182654

20210910_152956

20210910_151211

20210909_143036

Instrument Panel

16.9.2021 SMART GLIDE push button

16/09/202105/12/2021supik4 Comments

UPDATE: Now version with optional label is available on request.

SMART GLIDE momentary push button. Contact me if you are interested. This is a 3rd party non Garmin switch.

 

Instrument Panel

25.8.2021 Grip Sticks installed

29/08/2021supikLeave a comment
smart

smart

20210818_173050

20210818_171604

smart

smart

smart

Instrument Panel, 39 Control System

3.8.2021 Com / Nav 2 installed

28/08/202128/08/2021supikLeave a comment

GNC255

20210803_170923
20210803_170914

20210803_170831
Instrument Panel

4.7.2021 Rear Seat installed & brought to trial

28/08/202128/08/2021supikLeave a comment
20210704_181901
20210704_181847

20210618_182818
20210618_180735

PAINT / FURNISHING / UPHOLSTERY

24.6.2021 Rudder Trim Springs Inventory

28/08/2021supikLeave a comment
smart

INVENTORY

24.6.2021 Initial Weighting

28/08/202128/08/2021supikLeave a comment

still paintless..

smart
smart

smart
smart

smart
smart

smart
smart

smart
smart

smart
smart

smart
smart

smart
FINAL PREPARATIONS

18.6.2021 Sun Shades

28/08/2021supikLeave a comment

Sun Shades installed. Girls and kids go well with this airplane 😀

smart
20210618_190750

20210618_190742
smart

Welcome

12.6.2021 G5 Static+Total Pressure Connections

28/08/202129/08/2021supikLeave a comment

Instrument Panel almost finished:

20210716_123044
20210708_145408

20210708_134310
20210708_133053

20210708_131133
20210708_130906

20210708_111929
20210708_111917

20210618_183015
20210618_182949

20210612_233631
20210612_233602

20210612_232930
20210612_232854

20210612_224507
20210612_224318

20210612_224301
20210612_224136

20210612_222448
20210612_213548

12►
Instrument Panel

11.6.2021 Flight Controls Lock

28/08/202128/08/2021supikLeave a comment

Initial design seems to work well except ailerons / flaps lock. We run into the danger of damage when selecting flaps above 15deg with the lock installed. Ailerons + Wing Tip makes more sense but the discharger is in the way – we will think it over..

Rudder & Elevator lock works very well.

smart
smart

smart
smart

smart
smart

smart
smart

smart
smart

 

FINAL PREPARATIONS, Misc

10.6.2021 Panel Inserts & Decals

28/08/202114/10/2021supikLeave a comment

Designing and installing the Instrument Panel Insert Overlay, Fuel Valve, Exterior Decorative Door Sills, Key Switch Decal

Fuel Plate for Andair2
Fuel Plate for Andair

Fuel Plate for Andair OFF
EXPERIMENTAL Door Seals

DOME LIGHT Text rev3
ACS Key Switch Plate

310 Central Panel insert
20210716_100728

20210716_100701
20210708_131252

20210708_131231
20210708_131212

20210708_130906
20210708_112041

20210630_131543
20210610_113203

20210610_112333
20210610_111641

ENHANCEMENTS
Previous Articles

Get the latest news:

Sign up for regular updates and progress:

To-Do List

  1. -popisky: olej/motor, nadrze, kurenie/park/olej, batozina, ojo, 12v zasuvka, dvere

  2. -prirucka

  3. -dennik

  4. -suflik krytka design

  5. -AutoTrim function test on ground

  6. -odhaleny trvaly plus na HOT BAT BUS zbernici

  7. Add vent screens/protection to NORMAL Fuel Breathers & Negative Pressure Safety Relief Valve

  8. MAG METER Engine Run Up TEST / VIB TEST

  9. Glareshield handle covers

  10. Wiring Manual Update

  11. -Isolate Dome Light

  12. Verify G5 receives signal from GNC255 ?

  13. Loadsheet with & without towbar?

  14. Popisky pre ALT-1 a ALT-2 regler

  15. Tlacitko na vnutornej klucke lavych dveri ma volu, rezonuje

  16. Gascolator drain valve extensions

  17. Lexan pod predne sedacky, Lexan s popiskami na zadnu konzolu

  18. Klapky za letu nejdu automaticky z -3 na 0 poziciu

  19. Skontroluj limitne vychylky vyskovky

  20. pozri baffling na Z50

  21. Add speed limit for F15

  22. GSU Engine Run Up Test

  23. G3X loadsheet data input

    1. Skontroluj chod vyvazenia vyskovky
    2. Odpojit Rudder Trim na pravej strane (lavy pedal)
  24. Check DME Voice output & add label on GMA345

  25. Update G3x Nav Database

  26. Adjust ALT-2 Voltage output to 13,8V

  27. Check cable input to AHARS for possible vibration

Categories

  • FINAL PREPARATIONS (3)
  • Welcome (10)
    • BUILDER'S LOGBOOK (2)
  • VIDEOS (3)
  • Training Kit (5)
  • EMPENNAGE KIT (40)
    • 6 Vertical Stabilizer (3)
    • 7 Rudder (4)
    • 8 Horizontal Stabilizer (6)
    • 9 Elevators (8)
    • 10 Tailcone (7)
    • 11 Empennage Attach (6)
    • 12 Empenage Fairings (5)
  • WINGS KIT (46)
    • 13-16 Main Spar – Wing Top Skin (2)
    • 16 Top Wing Skins (1)
    • 17 Outboard Leading Edge (3)
    • 18 Fuel Tank (16)
    • 19 Stall Warning System (1)
    • 20 Bottom Wing Skins (5)
    • 21 Aileron (4)
    • 22 Flaps (4)
    • 23 Aileron Actuation (1)
    • 24 Wing Tip (7)
  • FUSELAGE KIT (97)
    • 25 Mid Fuse Bulkheads (3)
    • 26 Mid Fuse Ribs & Bottom Skins (5)
    • 27 Firewall (8)
    • 28 Fwd Fuse Ribs, Bhds & Bottom Skins (9)
    • 29 Fuse Side Skins (10)
    • 30 Step Installation (3)
    • 31 Upper FWD Fuselage Assembly (6)
    • 32 Tailcone Attachement (3)
    • 33 Baggage Area (6)
    • 34 Baggage Door (1)
    • 35 Access Covers and Floor Panels (2)
    • 37 Fuel System (4)
    • 38 Rudder Pedals & Brake System (5)
    • 39 Control System (6)
    • 40 Flap System (3)
    • 42 Rear Seat Backs (2)
    • 43 Cabin Cover (22)
    • 44 Wing Attachement (3)
  • FINISH KIT (89)
    • 49 SEATS & SEAT BELTS (2)
    • 45 Cabin Doors & Transparencies (36)
    • 46 Engine Mount & Landing Gear (4)
    • 47 Spinner & Cowling (22)
    • 48 Gear Leg & Wheel Fairings (22)
    • 50 Cabin Heat & Ventilation (3)
  • FIREWALL FORWARD (29)
    • FF1 ENGINE INSTALLATION (2)
    • FF2 COWLE BAFFLES (10)
    • FF3 CCONTROL CABLES (3)
    • FF4 FUEL SYSTEM (7)
    • FF5 OIL SYSTEM (2)
    • FF6 EXHAUST SYSTEM (3)
    • FAB 540 AP (8)
  • ENHANCEMENTS (101)
    • Misc (15)
    • Tow Bar Tailcone Storage (3)
    • ANDAIR Oil Separator (3)
    • Center Console (4)
    • PlaneAround Door Locking System (7)
    • OP48 AHRS Bracket (1)
    • Sun Shields (3)
    • Pedal Extensions from JD Air (1)
    • Overhead Console / System (13)
    • OP41 ELT Bracket (1)
    • Rudder Trim (2)
    • ANDAIR Fuel System (11)
    • Electrical Conduits (6)
    • Access / Inspection Covers (8)
    • Step Mount Support Bracket (1)
    • BERINGER Brakes & Parking Brake (13)
    • OP38 Electric Aileron Trim (3)
    • Interior Lights (4)
    • Exterior Lights (8)
  • ELECTRICAL & AVIONICS (131)
    • 220V OIL PREHEAT SYSTEM (4)
    • SUREFLY Electronic Magneto (1)
    • MISC (5)
    • External Power Connector (7)
    • Instrument Panel (66)
    • Antennas (10)
    • Wings (5)
    • Fuselage (2)
  • PITOT STATIC SYSTEM (13)
  • PAINT / FURNISHING / UPHOLSTERY (35)
  • Tools (3)
  • Workshop, Transports (6)
  • PROGRESS Updates – Cutaways (17)
  • INVENTORY (36)
  • SERVICE BULLETINS (3)

Recent Posts

  • 4.10.2021 Pitot Static Leak Test 28/07/2022
  • 3.10.2021 Interior Door Handle 28/07/2022
  • 2.10.2021 Front Seat Belts & Shoulder Harness 28/07/2022
  • 2.10.2021 Roll Servo has failed 28/07/2022
  • 9.9.2021 Right Instrument Panel with Labels 28/07/2022
August 2022
M T W T F S S
« Jul    
1234567
891011121314
15161718192021
22232425262728
293031  

Other Builder’s RV-10

  • RV-10 Gallery
  • RV-10 Cockpit

SEARCH THE WEBSITE

Powered by: www.AviatorShop.eu
RV-10 LOGBOOK ( *Stavebný denník* ) OM-ELA S/N 41519 staviteľ: Halanda - dozor: Benedikovič
KITSectionPage complete / memoDateHoursCompletedVerifiedCAA entry / memo
2563.9TOTAL Project Hours
2138.9TOTAL Project Hours
EMPENNAGEUnboxing / Inventory04/12/20158.5Halanda
EMPENNAGE6 Vertical Stabilizer6-2 -> 6-3 (incl. dimpling, deburring and test assy)05/12/20156.5HalandaBenedikovic
EMPENNAGE6 Vertical Stabilizer6-4 -> 6-5 (incl. priming)06/12/20157.2HalandaBenedikovic
EMPENNAGE6 Vertical Stabilizer6-507/12/20158.5HalandaBenedikovic
EMPENNAGE6 Vertical Stabilizer6-5 -> 6-6 finished08/12/20157.5HalandaBenedikovic
EMPENNAGE10 Tailcone10.2 -> 10.4 general alignment of parts, deburring, priming08/12/20152.5HalandaBenedikovic
EMPENNAGE10 Tailcone10.3 -> 10.5 bulkhead assembly-riveting09/12/20159HalandaBenedikovic
EMPENNAGE10 Tailcone10.7 -> 10.9 priming & riveting10/12/20159.5HalandaBenedikovic
EMPENNAGE10 Tailcone10.7 Riveting the side-walls to stringers & bulkheads11/12/20156.7HalandaBenedikovic
EMPENNAGE10 Tailcone10.0 -> 10.11 Deburring, Priming and Riveting the AFT Deck12/12/20154.5HalandaBenedikovic
EMPENNAGE10 TailconeTest-Fitting the upper skins13/12/20151HalandaBenedikovic
TOOLS15/12/20150.5HalandaReplaced compressor, oil change & filter cleaned
RV-10-Dopravny-Urad-kontrola-201515/12/2015 Inspected by The Transport Authority of Slovak Republic
EMPENNAGE10 Tailcone10.12 -> 10.26 Bolting the shoulder harness Anchores, Attaching the battery mount, bolting the elev. bellcrank, riveting the upper skin17/12/20158HalandaBenedikovic
EMPENNAGE11 Empennage Attach11.6, 11.8 -> 11.9 Assembling & priming the elev. pushrod, manufacturing & priming of the elev. trim parts17/12/20152.3HalandaBenedikovic
EMPENNAGE7 Rudder7.2 -> 7.3 Started works on the Rudder. Ribs, Stiffeners & Shear clips separated, deburred & primed.20/12/20153.5HalandaBenedikovic
EMPENNAGE7 Rudder7.4 -> 7.621/12/20155HalandaBenedikovic
EMPENNAGE7 Rudder7.6 -> 7.822/12/20156.5HalandaBenedikovic
EMPENNAGE7 Rudder7.9 -> 7.1027/12/20158HalandaBenedikovic
EMPENNAGE7 Rudder7.11 -> 7.12 Rudder finished. Added counterweights, skins bended.28/12/20159HalandaBenedikovic
EMPENNAGE12 Empennage Fairings12.2 -> 12.3 Rudder Fairings -finished28/12/20151.5HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer8.2 -> 8.7 1/1/20169.5HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer8.8 Testfitting 3/1/20164.5HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer8.8 -> 8.10 Dimpling, Deburring and Priming4/1/20167HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer8.11 -> 8.12 Riveting the front spars to the skin and inspar ribs to the front spar assy5/1/20165.5HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer8.11 -> 8.13 Riveting..6/1/20168.5HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer8.11 -> 8.13 Riveting..7/1/20165.2HalandaBenedikovic
EMPENNAGE8 Horizontal Stabilizer..8.14 FINISHED8/1/20166.5HalandaBenedikovic
EnhancementsLNDG LightsInstall KIT received, examined and inventored9/1/20160.5HalandaBenedikovic
EMPENNAGE9 Elevators9-2, 9-5 Separating Elevator Ribs, drilling, separating Shear Clips..10/1/20166HalandaBenedikovic
EMPENNAGE9 Elevators9-2 -> 9-5 Deburring, dimpling, priming. Riveting of the half ribs & rear spar.11/1/20167.5HalandaBenedikovic
EMPENNAGE9 Elevators9-5 -> 9-613/1/20168.5HalandaBenedikovic
EMPENNAGE9 Elevators9-6 -> 9-1014/1/20165HalandaBenedikovic
EMPENNAGE9 Elevators9-10 -> 9-1317/1/20167HalandaBenedikovic
EMPENNAGE9 Elevators9-13 -> 9-1518/1/20165HalandaBenedikovic
EMPENNAGE9 Elevators2nd Elevaror: 9-2, 9-5 Separating Elevator Ribs, drilling, separating Shear Clips..19/1/20168HalandaBenedikovic
EMPENNAGE9 ElevatorsTrim Tabs attached14/3/20167.5HalandaBenedikovic
WINGSUnboxing / Inventory15/3/20169.5Halanda
WINGSUnboxing / Inventory17/3/20165.3Halanda
EMPENNAGE9 Elevators9-18 -> 9-19 Trim Tab Hinge (Elevators Finished)18/3/20163.5HalandaBenedikovic
WINGS18 Fuel TankTest assembly19/3/20168.6HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-4 Dimpling, deburring, countersinking (general preparation of L tank for sealing20/3/20167.8HalandaBenedikovic
TOOLS20/3/2016HalandaAngle Grinder added to tools/equipment
WINGS18 Fuel Tank18-2 -> 18-4 23/3/20166.7HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-524/3/20167HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-525/3/20168HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-527/3/20166HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-529/3/20167.5HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-5 Sealing Ribs; let it dry for almost 2 days03/4/20166.3HalandaBenedikovic
WINGS18 Fuel Tank18-2 -> 18-5 Riveting ribs in the fuel tank05/4/20169HalandaBenedikovic
WINGS21 Aileron21-207/4/20168HalandaBenedikovic
WINGS21 Aileron21-2->21-408/4/20168.5HalandaBenedikovic
WINGS21 Aileron21-2->21-409/4/20167.3HalandaBenedikovic
RV-10-Dopravny-Urad-kontrola-2016.0112/05/2016 Inspected by The Transport Authority of Slovak Republic
WINGS21 Aileron21-5->21-9 12/5/20169.6HalandaBenedikovic
WINGS21 Aileron21-5->21-9 Ailerons finished14/5/20168HalandaBenedikovic
WINGS18 Fuel Tank1st leak test18/5/20163.5HalandaBenedikovic1st leak test with colored water successful! Both fuel tanks passed.
WINGS18 Fuel Tank18-4, 18-6 -> 18-8 Rear wall closed / sealed & clecoed19/5/20165.6HalandaBenedikovic
WINGS22 Flap22-2 -> 22-4 Deburred edges, ribs trimmed20/5/20167.5HalandaBenedikovic
WINGS18 Fuel Tank18-4, 18-6 -> 18-8 Rear wall riveted21/5/20168.9HalandaBenedikovic
WINGS22 Flap22-4 -> 22-9 Ribs & Subassemblies attached. Spar, trailing edge and skins dimpled22/5/201610.5HalandaBenedikovic
WINGS22 Flap22-4 -> 22-9 Ribs & Subassemblies attached. Trailing edge pro-sealed and clecoed for overnight.23/5/201610.6HalandaBenedikovic
WINGS22 Flap22-4 -> 22-9 Trailing Edge riveted24/5/20165.8HalandaBenedikovic
WINGS18 Fuel TankBalloon leak test4/6/20160.5HalandaBenedikovicSuccessful balloon leak test on 'L' fuel tank.
WINGS18 Fuel TankBalloon leak test5/6/20160.5HalandaBenedikovic'R' tank balloon bursted overnight, replaced in the morning
WINGS18 Fuel TankBalloon leak test6/6/20160.2HalandaBenedikovic'R' tank balloon leak test successful after 24hrs
WINGS17 Outboard Leading Edge17-2 -> 17-4 Assembly, Deburring, Dimpling of skins and ribs.6/6/20168.5HalandaBenedikovic
WINGS17 Outboard Leading Edge17-2 -> 17-4 Preparation / Priming7/6/201610.5HalandaBenedikovic
WINGS17 Outboard Leading Edge17-2 -> 17-4 Preparation / Priming8/6/201611HalandaBenedikovic
WINGS17 Outboard Leading Edge17-2 -> 17-4 Riveting of outboard ribs, cutting of the 'servie door'9/6/201611HalandaBenedikovic
WINGS17 Outboard Leading Edge17-2 -> 17-4 Re-Assembly / glecoing for final riveting10/6/20163.5HalandaBenedikovic
WINGS17 Outboard Leading Edge17-2 -> 17-4 Final riveting11/6/20167.5HalandaBenedikovic
WINGS13 Main SparSurface control & deburring15/8/20166.5HalandaBenedikovic
WINGS13 Main Spar13-1 -> 13-5 preparation & priming parts16/8/20168HalandaBenedikovic
WINGS13 Main Spar13-1 -> 13-5 Web extension installation, countersinking18/8/20166.5HalandaBenedikovic
WINGS13 Main Spar13-1 -> 13-5 Nutplate install19/8/20169HalandaBenedikovic
WINGS13 Main Spar13-1 -> 13-5 Tie down bracket & aileron bracket install, predrilling21/8/20167HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 Deburring edges22/8/201610HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 Deburring edges, shaping23/8/201610HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 Applying primer on wing ribs, pre-attachement with clecos25/8/20168.8HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 Riveting Flap Hinge Assemblies and Torque tube support bracket26/8/20169.5HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 Riveting Flaps to main spar05/9/20165.5HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 Riveting Flaps to main spar06/9/20166.5HalandaBenedikovic
WINGS14 Wing Ribs14-1 -> 14-6 various06/9/20167HalandaBenedikovic
WINGS14 Wing Ribs14-6 Bolts installation07/9/20163.5HalandaBenedikovic
WINGS15 Rear Spar15-1 -> 15-4 Deburring, preparation10/9/20169.5HalandaBenedikovic
WINGS15 Rear Spar15-1 -> 15-4 Deburring, preparation & priming of parts11/9/201610.5HalandaBenedikovic
WINGS15 Rear Spar15-2 Aileron bracket assy finished, pushrod hole copied12/9/20168HalandaBenedikovic
WINGS15 Rear Spar15-4 Final assembly / riveting13/9/20168HalandaBenedikovic
WINGS15 Rear Spar15-4 Final assembly / riveting14/9/20165.5HalandaBenedikovic
WINGS16 Top Wing Skins16-1 -> 16-4 Deburring, Dimpling18/9/20167.5HalandaBenedikovic
WINGS16 Top Wing Skins16-1 -> 16-4 Deburring, Dimpling19/9/20169.5HalandaBenedikovic
WINGS16 Top Wing Skins16-1 -> 16-4 Priming20/9/20164.5HalandaBenedikovic
WINGSSB 16-03-28Unboxing / Inventory24/9/20160.5HalandaBenedikovicVan's Service Bulletin SB 16-03-28 arrived
Transport28/9/20168HalandaMoving Tailcone, Fin and Stab to a new location to free up some space..
WINGSSB 16-03-28Disassembly of the old brackets to extract the original bearings. Deburring, priming, painting, assembly & riveting. 25/10/20169.25HalandaBenedikovicVan's Service Bulletin SB 16-03-28 APPLIED
WINGS20 BOTTOM WING SKINS20-4 Preparation and installation of GAP FAIRINGS incl. Stiffeners26/10/20168.5HalandaBenedikovic
WINGS16 Top Wing Skins16-3 Preparation and riveting of the top skin (L Wing)27/10/20166.7HalandaBenedikovic
ELECTRIC AILERON TRIMOP-38OP38-2 -> OP38-4 preparation of parts, deburring, priming and assembly27/10/20164HalandaBenedikovic
WINGS20 BOTTOM WING SKINS20-5 Deburring, dimpling & priming of bottom skins. Attaching fasteners28/10/20165HalandaBenedikovic
WINGS20 BOTTOM WING SKINS20-5 Deburring, dimpling of Access plates30/10/20162HalandaBenedikovic
ELECTRICALCorrugated Conduit09/11/2016HalandaPurchase of 12m
WINGSRivetsInventory of missing rivets21/11/20160.1HalandaAdded & inventory of missing rivets: 120 and 100pcs respectively
EnhancementsWing LNDG lightsCutouts in R leading edges09/12/20164.5HalandaBenedikovic
EnhancementsWing LNDG lightsCutouts in L leading edges; LNDG Brackets installation10/12/20168.5HalandaBenedikovic
WINGS16 TOP WING SKINS16-3 Riveting the top wing skins (missing row with AN426AD3-410/12/20161.2HalandaBenedikovic
WINGS17 OUTBOARD LEADING EDGE17-4 L & R outboard leading edges riveted to main spar assy11/12/20165.5HalandaBenedikovic
Purchase of wood for the wing cart12/12/20163Halanda
Wing cart assembly12/12/20165.75HalandaCredit for the idea and plans goes to Mouser! We have used your plans with light modifications. THANK YOU
WINGS18 FUEL TANKSPriming12/12/20161.75HalandaBenedikovic
WINGS18 FUEL TANKSAttaching Fuel tanks to main spar assy. 13/12/20164.5HalandaBenedikovicTanks had to be removed twice due to overlaping skins.. Very tight fitment.
nsat-1512201615/12/2016 Inspected by The Transport Authority of Slovak Republic
WINGS23 Aileron ActuationPreparation, shortening the pushrods to required length, drilling, riveting and priming the parts.03/03/20179.5HalandaBenedikovic
WINGS23 Aileron ActuationInstallation04/03/20172HalandaBenedikovic
PITOT STATIC SYSTEMPITOT STATIC SYSTEMPreparation, drilling. Ready for final assembly05/03/20177.5HalandaBenedikovic
PITOT STATIC SYSTEMStatic ports, hardware and tubeInventory06/03/20170.1HalandaInventory CLEVELAND T. Static KIT
ELECTRICAL & AVIONICSVOR/ILS RAMI AntennaInventory06/03/20170.1HalandaInventory RAMI AV-520
TRANSPORTS & PAINTJOBTransport of assembled parts and preparation of new workshop26/11/201711.5BenedikovicMoving tailcone and wings to new workshop.
ELECTRICAL & AVIONICSVOR/ILS AntennaPreparation & Installation01/12/20175HalandaBenedikovic
PITOT STATIC SYSTEMPITOT STATIC SYSTEMPrime & Installation01/12/20170.5HalandaBenedikovic
PITOT STATIC SYSTEMStatic ports InstallationInstallation and bonding with Araldite 42005/12/20172.3HalandaBenedikovic
ELECTRIC AILERON TRIMOP-38 Electric Aileron Trim to Access Door AttachOP38-2 -> OP38-4 Attaching the trim unit to Wing Access Door 05/12/20170.5HalandaBenedikovic
EMPENNAGE11 Empenage Attach11-4 Fabricating and attaching shims19/12/20173HalandaBenedikovic
EnhancementsWing LNDG lightsInstallation of the Light holders/frame and plexi glass31/01/20188HalandaBenedikovic
EMPENNAGE11 Empenage Attach11-4, 11-5 Attaching and match drilling the horizontal stabilizer to empennage02/02/20188.5HalandaBenedikovic
EMPENNAGE11 Empenage AttachClosing the inner side of the VS Tip Fairing & fine tuning its leading edge with micro balloons06/02/20183HalandaBenedikovic
EMPENNAGE11 Empenage AttachClosing the inner side of the VS Tip Fairing & fine tuning its leading edge with micro balloons07/02/20181HalandaBenedikovic
EMPENNAGE11 Empenage Attach11-6 Pushrod Assembly07/02/20182HalandaBenedikovic
EnhancementsBERINGER BrakesArrival, Inventory, Pre-assembly09/02/20183HalandaBenedikovic
EnhancementsLANDING LIGHTSInventory & function test26/02/20180.5HalandaBenedikovic
FUSELAGE KITInventory05/03/20189BenedikovicKit Inventory
FUSELAGE KITInventory06/03/20188.5BenedikovicKit Inventory
FUSELAGE KIT25 MID FUSE BULKHEADS25-2 -> 25-5 Basic preparation, priming, riveting..07/03/20188HalandaBenedikovic
FUSELAGE KIT25 MID FUSE BULKHEADS25-5 -> 25-8 BOLTING THE AFT BULKHEAD TOGETHER; REAR SPAR BULKHEAD ASSEMBLY; FUSELAGE BULKHEAD ASSEMBLY08/03/20189.5HalandaBenedikovic
FUSELAGE KIT25 MID FUSE BULKHEADS25-5 -> 25-8 BOLTING THE AFT BULKHEAD TOGETHER; REAR SPAR BULKHEAD ASSEMBLY; FUSELAGE BULKHEAD ASSEMBLY09/03/20188.7HalandaBenedikovic
FUSELAGE KIT25 MID FUSE BULKHEADS25-7 -> 25-8 Drilling, Deburring, Priming, Riveting the REAR SPAR BULKHEAD ASSEMBLY & FUSELAGE BULKHEAD ASSEMBLY13/03/20188.5HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-2 -> 26-4 Procedure according plans14/03/20186.8HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-2 -> 26-4 Procedure according plans15/03/20184.75HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-2 -> 26-4 ATTACHING SEAT RIB SUBASSEMBLIES TO THE AFT CENTER SECTION BULKHEAD SUBASSEMBLY16/03/20188.5HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-2 -> 26-4 Preparation of rear spar bulkhead ribs17/03/20187.5HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-2 -> 26-4 RIB ATTACH TO REAR SPAR BULKHEAD18/03/20189HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-5 -> 26-6 RIB TO FUSELAGE BULKHEAD ATTACH19/03/20189HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-7 -> 26-8 BOTTOM SKINS - Dimpling, Deburring, Priming +glecoed to ribs20/03/20186.5HalandaBenedikovic
EnhancementsSTEP MOUNTFabrication, Priming, Drilling & Riveting the additional support bracket26/03/20183HalandaBenedikovic
FUSELAGE KIT26 MID FUSE
RIBS &
BOTTOM
SKINS
26-7 -> 26-8 BOTTOM SKINS -glecoed to ribs26/03/20181HalandaBenedikovic
FUSELAGE KIT27 FIREWALL27-2 BULKHEAD ASSEMBLY -preparation, drilling, deburring, priming, riveting27/03/20187.5HalandaBenedikovic
FUSELAGE KIT27 FIREWALL27-2 BULKHEAD ASSEMBLY -preparation, drilling, deburring, priming, riveting28/03/20182HalandaBenedikovic
FUSELAGE KIT26 MID FUSE RIBS & BOTTOM SKINS26-7 -> 26-8 BOTTOM SKINS rivetiting29/03/20184.5Benedikovic Jr. & son MiskoBenedikovic
FUSELAGE KIT27 FIREWALL27-2 -> 27-5 works according plans30/03/20188HalandaBenedikovic
FUSELAGE KIT27 FIREWALL27-2 -> 27-5 works according plans01/04/20187.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-4 DRILL AND TRIM CONTROL COLUMN MOUNT04/04/20183HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-2 -> 28-6 DRILLING, DEBURRING, PRIMING & ASSEMBLY WITH CLECOS05/04/20187.75HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-5 FINAL DRILL BOTTOM SKIN, MATCH-DRILL CONTROL COLUMN MOUNT06/04/20184.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-5 Priming FUSE FLOOR RIBS & various parts, Dimpling FWD BOTTOM SKIN09/04/20185.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN, 27 FIREWALL28-5, 28-6, 28-8, 28-11, 27-6 (HI LOKs used instead of regular rivets) Procedure according Constr. Plans11/04/20187.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-9 MATE MID FUSELAGE ASSEMBLY TO FORWARD FUSELAGE ASSEMBLY + SKIN OVERLAP (CLECOED)13/04/20183.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-9 MATE MID FUSELAGE ASSEMBLY TO FORWARD FUSELAGE ASSEMBLY. F-1004K-L & R Center Section Side Plates (primed, clecoed & partially riveted)15/04/20184.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS, BHDS & BOTTOM SKIN28-16 -> 28-17 DRILLING THE LANDING GEAR MOUNT18/04/20183.75HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-2 -> 29-4 Fabricating BENDING & CLAMPING BLOCKS + Bending LONGERONS19/04/20187.25HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-4 -> 29-520/04/20188HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-5 -> 29-1021/04/20187HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-5 -> 29-1022/04/20184HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-5 -> 29-1025/04/20187.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELReceived SWITCH GUARDS & PIEZOELECTRIC BUZZER (Stall Warning)29/04/20180.5HalandaInventory
FUSELAGE KIT29 FUSE
SIDE SKINS
29-12 -> 29-14 per plans01/05/20187.5HalandaBenedikovic
FUSELAGE KIT27 FIREWALLProblem discovered: rivets out of spec03/05/20180.5HalandaBenedikovic
FUSELAGE KIT38 RUDDER PEDALS & BRAKE SYSTEM38-2 Creating Brake Pedals03/05/20183HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-19 Vent Doors: Cutting brackets and slides apart; Assembling the doors; Priming; Riveting, Assembling doublers and brackets.03/05/20182HalandaBenedikovic
FUSELAGE KIT39 CONTROL SYSTEM39-6 Fabricated spacer, drilled, primed & riveted the Elevator Idler Arm.03/05/20181HalandaBenedikovic
FUSELAGE KIT27 FIREWALLRemoving the bracket with rivets out of spec WD-1002-L-PC03/05/20181.25HalandaBenedikovic
FUSELAGE KIT30 STEP INSTALLATION30-2 -> 30-4 Installing steps with additional stiffening plates riveted from the backside of where the delrin is mounted. Additionaly step bushings from TCW Tech were added.04/05/20183.25HalandaBenedikovic
FUSELAGE KIT29 FUSE
SIDE SKINS
29-5 ; 29-8 ; 29-17 (deburring, dimpling, bending, priming)12/05/20182.5HalandaBenedikovic
FUSELAGE KIT35 ACCESS COVERS AND FLOOR PANELS35-2 (Floor panels installation)12/05/20181.5HalandaBenedikovic
INVENTORYSpare & Replacement PartsSpare & Replacement parts14/05/20180.25HalandaSpare & Replacement Parts from Vans
FUSELAGE KIT29 FUSE
SIDE SKINS / 30 Step Installation
Glecoed Side Skins & Steps Priming14/05/20183.5HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTSAccess / Inspection Covers, 33 Baggage Area(33-2) Baggage Floors w. Inspection Covers16/05/20185.5HalandaBenedikovic
INVENTORYSpare & Replacement PartsReceived the replacement bracket from Vans with spare parts as well as rivets and brake hoses.29/06/20180.3Halanda
ENHANCEMENTSAccess / Inspection CoversCutting an opening for the tunnel access/inspection cover.30/06/20181.5HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTS27 FIREWALL, BERINGER Brakes, 38 URDDER PEDALS & BRAKE SYSTEMInstalling the Rudder Pedal Bearing Block together with the Beringer Parking Brake Valve on the Pilot’s side & replacing the WD-1002-L-PC bracket which was removed before due to rivets out of spec03/07/20185.75HalandaBenedikovic
FUSELAGE KIT29 FUSE SIDE SKINSRiveting the Side Skins.04/07/20183.5Halanda, Benedikovic Jr.Benedikovic
FUSELAGE KIT29 FUSE SIDE SKINS(29-18) Glecoing the FWD Side Skins.05/07/20180.5HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTS29 FUSE SIDE SKINS, ACCESS / INSPECTION COVERS(33-2) Preparing the seat floors according to plans + creating access/inspection openings.07/07/20185HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTS29 FUSE SIDE SKINS, ACCESS / INSPECTION COVERS(33-2) Seat Floors - Openings were drilled for goose necks which will be covered by the side panels. Parts primed and nutplates riveted.09/07/20188.5HalandaBenedikovic
FUSELAGE KIT29 FUSE SIDE SKINS(29-18) FWD Side Skins- Karol B. Jr. riveting the FWD Side Skins today.. 14/07/20183.75Benedikovic Jr.Benedikovic
FUSELAGE KIT31 UPPER FWD FUSELAGE ASSEMBLY(31-1 -> 31-10) Starting works on Section 31 (following plans, basic preparation)15/07/20185HalandaBenedikovic
FUSELAGE KIT31 UPPER FWD FUSELAGE ASSEMBLY(31) Dimpling, Deburring & Priming Parts16/07/20183HalandaBenedikovic
FUSELAGE KIT31 UPPER FWD FUSELAGE ASSEMBLY(31) ..works continue on Upper FWD Fuse Assy, Upper skin dimpled & glecoed17/07/20184HalandaBenedikovic
FUSELAGE KIT31 UPPER FWD FUSELAGE ASSEMBLY(31) Upper FWD Fuse Assy - preparations finished, ready for final riveting.18/07/20182.5HalandaBenedikovic
FUSELAGE KIT32 TAILCONE ATTACHEMENT32-1 -> 32-6 Tailcone Attachement - following plans19/07/20187.5HalandaBenedikovic
FUSELAGE KIT30 STEP INSTALLATION(30) Following plans20/07/20184HalandaBenedikovic
FUSELAGE KIT32 TAILCONE ATTACHEMENTRiveting the tailcone with fuse together as called out in the plans.22/07/20184.8HalandaBenedikovic
FUSELAGE KIT40 FLAP SYSTEM(40-4 -> 40-8) As called out in the plans.23/07/20186HalandaBenedikovic
INVENTORYANDAIR Fuel SystemInventory and inspection of ANDAIR components. Consisting of: Fuel Pump, Fuel Valve Selector with ext. rod, 2 Gascolators (one for each wing)24/07/20181Halanda
FUSELAGE KIT32 TAILCONE ATTACHEMENT(32) Last rivets set to attach both main parts..27/07/20182.5HalandaBenedikovic
FUSELAGE KIT28 FWD FUSE RIBS BHDS BOTTOM SKINS(28) Riveting panels in place.27/07/20183.5HalandaBenedikovic
FUSELAGE KIT29 FUSE SIDE SKINS(29-21) Installing the Landing Gear Mount.28/07/20184.75HalandaBenedikovic
ENHANCEMENTSELECTRICAL CONDUITSInstallation of Electrical Conduits in fuselage.30/07/20183.75HalandaBenedikovic
FUSELAGE KIT33 BAGGAGE AREA(33-1 -> 33-6) Riveting as called out in plans.07/08/20189HalandaBenedikovic
FUSELAGE KIT34 BAGGAGE DOORManufacturing the Baggage Door10/08/20187.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELInitial 3D Instrument Panel Planing15/08/20189.5Halandaplaning
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D Design work continues17/08/20186Halandaplaning
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D Designing push buttons & descriptions19/08/20183.5Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D Design: Push buttons, Warning Lights & Toggle switches placed on the instrument panel. Looking for the best place with ergonomy.20/08/20184Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D Design: Backup EFIS & Master Switch added.30/08/20183Halanda
ELECTRICAL & AVIONICSELECTRICAL & AVIONICS3D Design: Rendering the panel with 'live' displays and backlit some of the switches for visualization.03/09/20184.5Halanda
FUSELAGE KIT42 REAR SEAT BACKS(42) Manufacturing Rear Seat Backs05/09/20185HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTS37 FUEL SYSTEM, ANDAIR FUEL SYSTEMManufacturing the fuel lines to the gascolators and finding a suitable place to mount them. Both gascolators will be hidden in the wing roots.06/09/20182HalandaBenedikovic
FUSELAGE KIT42 REAR SEAT BACKS(42) Rear Seat Backs primed & mounted06/09/20183HalandaBenedikovic
FUSELAGE KIT37 FUEL SYSTEM, 38 RUDDER PEDALS & BRAKE SYSTEM(38 & 37)Brake & Fuel Lines installation07/09/20187.75HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D Design: I have redesigned the pushbutton for disconnecting all autopilot servos/trim & flap motors with one button..09/09/20181.5HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTS37 FUEL SYSTEM, ANDAIR FUEL SYSTEMFabricating, priming & installing mount brackets for both ANDAIR gascolators.09/09/20183.5HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTS37 FUEL SYSTEM, ANDAIR FUEL SYSTEMThe bracket looks a bit complicated; the goal was to have the fuel pump easily accessible from the Inspection Access Hatch. Fabricated the fuel line from the ANDAIR fuel selector to the ANDAIR fuel pump. This fuel pump features an internal bypass.11/09/20186.75HalandaBenedikovic
FUSELAGE KIT39 CONTROL SYSTEMInstalling the rudder cables with fairings.12/09/20183.25HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELRendering with the new switch. I am not happy with the current location and will most likely move it to the left side of the panel.13/9/20181.5HalandaBenedikovic
FUSELAGE KIT39 CONTROL SYSTEMInstallation as plans call out. Rudder pedals powder coated black.13/09/20187.75HalandaBenedikovic
FUSELAGE KIT39 CONTROL SYSTEM, 40 FLAP SYSTEMRespective chapters -following plans.14/09/20189HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTSBERINGER BRAKES, 38 RUDDER PEDALS & BRAKE SYSTEMRudder Pedals with Beringer Master Cylinders installation.15/09/20184.5HalandaBenedikovic
FUSELAGE KIT, ENHANCEMENTSBERINGER BRAKES, 38 RUDDER PEDALS & BRAKE SYSTEMInstallation of BERINGER Hydraulic brake houses. Following BERINGER installation manual.18/09/20186.75HalandaBenedikovic
FUSELAGE KIT44 WING ATTACHEMENTPriming the skin and installing the root fairing supports on the fuselage skin.19/09/20185.75HalandaBenedikovic
FUSELAGE KIT39 CONTROL SYSTEM(39) Finishing Rudder Cables installation.21/09/20182.5HalandaBenedikovic
ENHANCEMENTSRUDDER TRIMManufacturing a Rudder Trim prototype. The trim will actuate directly on the rudder pedals with the help of an electrical servo motor. Finding the proper spring length with proper tension will be a challenge.23/09/20184.5HalandaBenedikovicPrototype
ENHANCEMENTSRUDDER TRIMServo motor installed and connected to the copilot’s left rudder pedal.25/09/20184HalandaBenedikovicPrototype (Won't be connected during initial test flights)
INVENTORYANDAIR FUEL SYSTEM COMPONENTSANDAIR elbows, blanking plugs and drain valves for both fuel gascolators.02/10/20180.25Halanda
ENHANCEMENTSACCESS / INSPECTION COVERSManufacturing and riveting the backplate with nutplates to the tunnel acccess/inspection cutout.02/10/20182.5HalandaBenedikovic
INVENTORYFans, Grills & Lemo PlugsDefrost Fans with Grills & DC Lemo Plug Install Kit03/10/20180.25Halanda
ENHANCEMENTSOP-41ELT bracket drilled, primed and riveted nutplates, finally riveted in the e-bay/battery compartment.03/10/20182.5HalandaBenedikovic
FUSELAGE KIT44 WING ATTACHEMENT(44) Manufacturing and priming Wing Root Fairings as called out in plans.03/10/20183.5HalandaBenedikovic
ENHANCEMENTSANDAIR FUEL SYSTEMInstalling ANDAIR plugs, elbows & drain valves on each gascolator.04/10/20180.75HalandaBenedikovic
ENHANCEMENTSOVERHEAD CONSOLE / SYSTEMNACA Cutouts for Overhead Fresh Air04/10/20182HalandaBenedikovic
FINISH KIT50 CABIN HEAT & VENTILATION(50) PIC & COPI Front NACA Vents installed.08/10/20183.5HalandaBenedikovic
ENHANCEMENTSACCESS / INSPECTION COVERSRear Bulkhead Access Door Cutout: Cutout was done using a water jet. The access will be hinged on the upper part to allow quick and easy access to the battery / electronic-bay.09/10/20188HalandaBenedikovic
ENHANCEMENTSACCESS / INSPECTION COVERSRear Bulkhead Access Door: Completed with 2 locking latches and primed on the battery/e-bay side.10/10/20187.5HalandaBenedikovic
INVENTORYNew Parts ArrivalInventory of items: Door Strut Attach Brackets (Planearound), New Door 180 Kit (Planearound), Wheel Bracket Fairing Spacers (Planearound), Angled Door Pins & Delrin Pin Guides (Planearound), Sirs Light Aircraft Compass, Rudder Pedal Extensions from (JD Air), Infinity Grips, Carling backlit (Mom ON-OFF-ON Mom) Switches and Blends.11/10/20181Halanda
FUSELAGE KIT31 UPPER FWD FUSELAGE ASSEMBLY(31-2 -> 31-9) Riveting the Subassembly to Fuselage, FWD Fuse Top Skin dimpled & Rear Bulkhead primed from the cabin side.11/10/20182HalandaBenedikovic
FUSELAGE KIT33 BAGGAGE AREA(33-10) Installing the Wear Blocks to the Baggage Bulkhead.11/10/20181.5HalandaBenedikovic
FUSELAGE KIT43 CABIN COVER(43) Started works on the repaired Cabin Cover & first test fit.15/10/20189.5HalandaBenedikovic
FUSELAGE KIT43 CABIN COVER(43-1 -> 43-13) Triming & Match Drilling Cabin Top.16/10/20188.75HalandaBenedikovic
INVENTORYVarious new parts arrivalROSEN Sun Visors, SUPERIOR PANEL TECHNOLOGY Light Strip, External Power Receptacle, External Power Plug, Electrical Cables, Pitot / Static Tube System, Antennas (Marker Beacon, DME, TXPD, ADS-B, FLARM, 2xVHF), Ray Allen POS-12 Position Sensor, Hidden Oil Door Hinge & various fittings, grommets, New primer spray cans from Colorlak16/10/20181Halanda
ENHANCEMENTS, ELECTRICAL & AVIONICS, PITOT STATIC SYSTEMPEDAL EXTENSIONS, WING ELECTRICS, PITOT STATIC SYSTEMInstalling Corrugated Conduits in Wings, grommets in the fuselage to protect conduits, JD Pedal Extensions, Pitot & AOA tubes in L Wing.18/10/20186HalandaBenedikovic
PITOT STATIC SYSTEMPITOT STATIC SYSTEMStatic System Installation in tailcone.21/10/20184HalandaBenedikovic
ELECTRICAL & AVIONICS, PITOT STATIC SYSTEMExternal Power Connector, PITOT STATIC SYSTEMWorks continued on the Pitot Static system (Wings – Fuselage Attach Points). 3D printing conduit holders for the Electronic / Battery Bay Compartment & Ext Power Plug Cover. Manufacturing the Baseplate for the Ext Power Connector incl a switch (for either charging the battery with a regulated Ext Pwr or unregulated for engine start only).22/10/20186HalandaBenedikovic
ELECTRICAL & AVIONICSExternal Power ConnectorExternal Power Connector Base Plate: Finished, primed & installed.23/10/20184HalandaBenedikovic
FUSELAGE, ENHANCEMENTS40 FLAP SYSTEM, FLAP POSITION SENSORManufacturing, priming and installation of an L-Bracket for the Flaps Position sensing.23/10/20183HalandaBenedikovic
WINGS20 BOTTOM WING SKINS(20-5 -> 20-6) Riveting Inboard Bottom Skins on both wings.25/10/20185HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELCutting holes for 2 Defrost/Avionics Cooling Fans. The SilverStone 80mm grills will be mounted from below.26/10/20181.5HalandaBenedikovic
WINGS20 BOTTOM WING SKINS(20-5 -> 20-6) Riveting Outer Bottom R-Wing Skin.31/10/20183.5HalandaBenedikovic
WINGS24 WING TIP(24) Wing Tip R-Wing. Installing the wing tip on R-wing using hinges (Mouser method).05/11/20186.75HalandaBenedikovic
INVENTORYVarious parts receivedGARMIN Pitot with regulator, GARMIN AutoPilot Servos with Connector Kits, Limit switches mechanical & reed sensor, ANDAIR Oil / Air Separator07/11/20180.75Halanda
WINGS24 WING TIP(24) Wing Tip R-Wing; ..works continue, riveted & bonded with Araldit. Manufactured carbon fiber rib (to copy aileron trailing edge) installed.07/11/20186HalandaBenedikovic
ENHANCEMENTSEXTERIOR LIGHTS11/11/20183HalandaBenedikovic
WINGS, ENHANCEMENTS, ELECTRICAL & AVIONICSANTENNAS, 24 WING TIP, EXTERIOR LIGHTSLanding Light Bracket Primed & Installed with light, (24) filling the gap between wing & wing tip, ADS-B IN Antenna installation.13/11/20186.75HalandaBenedikovic
ELECTRICAL & AVIONICS, ENHANCEMENTSWINGS, OP38 ELECTRIC AILERON TRIMGARMIN Auto Pilot Roll Servo & Roll Trim Servo springs installed. Following Vans & Garmin install manual.15/11/20183.75HalandaBenedikovic
ELECTRICAL & AVIONICS, ENHANCEMENTSFUSELAGEGARMIN Auto Pilot Pitch Servo installed - following Garmin install manual.17/11/20182.75HalandaBenedikovic
PITOT STATIC SYSTEMPITOT STATIC SYSTEMInstalling Heated & Regulated GARMIN Pitot Tube + looking for a good place for installing the regulator.19/11/20181.5HalandaBenedikovic
INVENTORYConnectors & Push/Pull Cables received.INVENTORY TE DT&DTM Deutsch Connectors & Push/Pull Cables.22/11/20182Halanda
WINGS, PITOT STATIC SYSTEM20 BOTTOM WING SKINS(20-5 -> 20-6) Riveting Outer Bottom L-Wing Skin. Installation of Pitot Tube with Gretz Mast finished. 22/11/20184.5HalandaBenedikovic
WINGS24 WING TIP(24) Wing Tip L-Wing. Same process and method like done and documented on R-Wing..24/11/20186HalandaBenedikovic
WINGS24 WING TIP(24) Wing Tip L-Wing ..works continue. Leaving the Araldit bond to cure close to the source of heat.26/11/20184.5HalandaBenedikovic
INVENTORYBERINGER BRAKES receivedBERINGER FUSELAGE KIT: Wheels, Brakes (with floating calipers), tubes, brake bleeding kit & components incl. tire changing tools for different tire sizes received.27/11/20181Halanda
WINGS24 WING TIP(24) Wing Tip L-Wing - Finishing the works on the Left Wing Tip. Carbon fiber rib installed & gap filled with EPOXY and micro between wing skin and tip.30/11/20182.75HalandaBenedikovic
INVENTORYSwitchesFlap Switch & Alternate Static Air Source switch - Honeywell MicroSwitch (Mom ON-OFF-Mom ON). The Alt Static Air Source switch will open a hole in the switch body to allow for alternate static cabin air source in case both outer static sources get plugged.03/12/20180.25Halanda
RV-10-Dopravny-Urad-kontrola-11.12.201811/12/2018 Inspected by The Transport Authority of Slovak Republic
PITOT STATIC SYSTEM, ELECTRICAL & AVIONICSGarmin Pitot Heat Regulator mounted11/12/20182.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELFlap Switch Actuator 3D design for the Instrument Panel visualization. 18/12/20181Halanda
ELECTRICAL & AVIONICSANTENNASMounting the VHF, TXPD & Marker Beacon Antennas on the belly.18/12/20186HalandaBenedikovic
INVENTORY-Door gas struts (Bansbach B0N0F50-100-247/530N Gas Spring 4″(100mm) Stroke 10″(247mm) A1 M8 Hinge Eye -have to order E2 M8 to fit the Plane Around attach brackets. -Push & Pull controls for heating, parking brake and Engine Alternate Air -firewall passthrough18/12/20180.25Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANELInstrument Panel 3D visualization with Flaps Actuator&Switch19/12/20182.5Halanda
EMPENAGE KIT12 EMPENAGE FAIRINGS(12-5 -> 12-6) Starting adjustments and installation of the tailcone fairing.19/12/20183HalandaBenedikovic
EMPENAGE KIT12 EMPENAGE FAIRINGS(12-5 -> 12-6) Works on tailcone fairing21/12/20183.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELInstrument Panel 3D rendering; Backup battery guard removed. Static source guarded switch moved to the left panel + minor changes.22/12/20185.5Halanda
ENHANCEMENTSEXTERNAL POWER CONNECTORReplacing the external power switch with a guarded version for selecting the main battery contactor on or off with external power connected.4/1/20190.5HalandaBenedikovic
ELECTRICAL & AVIONICS, EMPENAGE KITEXTERNAL POWER CONNECTOR, ANTENNAS, 12 EMPENAGE FAIRINGS..works continue on the tailcone fairing + support bracket installed for the external power recept. Finding the right mounting place for the upper VHF antenna.4/1/20196.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELDesign works on the Instrument Panel: Modeling an Air Vent
TRAFFIC MUTE switch added
COMPSS LIGHT switch added
IND LTS switch repositioned to the R Panel
Placing the equipment on the rear instrument wall (sub-panel)
6/1/20198.5Halanda
EMPENAGE KIT12 EMPENAGE FAIRINGSTailcone Fairing finished8/1/20197HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D design work: Added Deuce Schottky Diode Heat Sink & FLARM AT-1 warning system Added Vishay potentiometers for switch backlighting and glareshield10/1/20196HalandaBenedikovic
ELECTRICAL & AVIONICSANTENNASVHF Antenna Mount on Tailcone12/1/20196.5HalandaBenedikovic
INVENTORYDEUCE SCHOTTKY DIODE for Essential Bus & Grinder15/1/20190.25Halanda
ENHANCEMENTSBERINGER Brakes & Parking BrakeManufacturing and installing a bracket to hold the parking brake sensor & cable.16/1/20194HalandaBenedikovic
ENHANCEMENTSMiscManufacturing the center console for rear seats.17/1/20193HalandaBenedikovic
INVENTORYReceived VISHAY Potentiometers 10kOhm (MIL spec)17/1/20190.25Halanda
ENHANCEMENTSMiscRear Seats Center Console update21/1/20194.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D Design Work: Minor Design Update on the Instrument Panel22/1/20193.5Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANELGetting Mesh Data of the Aerosport 310 Panel3/2/2019Aerosport 3D panel Mesh Data recieved
ENHANCEMENTSOVERHEAD CONSOLE / SYSTEMOverhead Console Vents & Alu Flanges5/2/20196.5HalandaBenedikovic
WINGS KIT24 WING TIP(24-2) Cee Baylees Wing Tip Lenses9/2/20193.5HalandaBenedikovicUPDATE: Unfortunately CEE BAYLEES never responded to my complaints. I'll have to order the original ones from Vans..
ELECTRICAL & AVIONICSINSTRUMENT PANELAndair Fuel Valve added to Cockpit Visualization12/2/20191.5Halanda
ENHANCEMENTSCENTER CONSOLEThrottle Quadrant Connecting Points22/2/20195.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELFitting the Aerosport 310 panel7/3/20197.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELFitting the Aerosport 310 panel incl. vents8/3/20193HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELFitting the Aerosport 310 panel w. Armrest11/3/20196HalandaBenedikovic
FUSELAGE KIT / ENHANCEMENTS37 FUEL SYSTEM / ANDAIR FUEL SYSTEM(37) Fitting the ANDAIR Fuel Selector to the Aerosport Armrestpanel12/3/20197.5HalandaBenedikovic
INVENTORY / INSTRUMENT PANELInventory: APEM Master & Backup Switches received12/3/2019.25Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANELMounting the Aerosport Throttle Quadrant: ..mating the throttle quadrant to the tunnel & the aerosport center console. Made holes for the push&pull cables to operate the parking brake and the alternate engine air in the left side panel and forward & rear heat in the right panel.14/3/20195.5HalandaBenedikovic
INVENTORYInventory: ANDAIR Fitting Extensions & Sphere Steel Grommets: Received the Andair Fitting Extensions for the Gascolators to route the tubes downwards + Sphere Steel Grommets for the firewall to accomodate the push/pull cables.15/3/20190.25Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANELReceived planes created out of mesh data: ..for the cockpit visualization.15/3/2019
ENHANCEMENTS ANDAIR FUEL SYSTEMMounting Andair Fitting Extensions: ..on both sides L & R16/3/20191HalandaBenedikovic
ENHANCEMENTS INSTRUMENT PANELStarting works on the cockpit visualization incl. the 310 panel17/3/20198.5Halanda
ENHANCEMENTS / FUSELAGE KIT Misc / 27 FIRE WALLMounting the Sphere Steel Grommets to the Firewall: ..and checking operation with the push and pull cables. The lowest thing push&pull is there to operate the Alternate Engine Air.18/3/20193.5HalandaBenedikovic
ELECTRICAL & AVIONICS / ENHANCEMENTS INSTRUMENT PANEL / CENTER CONSOLEDrilling holes for electrical switches19/3/20191.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELDetails on the Cockpit Visualization: Background and text for flaps UP and DN adjusted.20/3/20190.5Halanda
FINISH KIT47 SPINNER & COWLING(47) Cowl Attach Hinges: (47-6 -> 47-8) Fabricating and riveting the Cowl Attach Hinges.20/3/20193.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELLaser test engraving rocker switches27/3/2019Samples received from our partner company: TECHMIND
ELECTRICAL & AVIONICSINSTRUMENT PANELSpray painting push buttons & indicators: ..with Black Matte RAL 90054/4/20191Halanda
INVENTORYInventory: Gas strut attachements, GPS Antennas, Firewall Foil18/4/20190.25Halanda
INVENTORYInventory: Arrival of the Finnish Kit23/4/20199Halanda
ELECTRICAL & AVIONICSINSTRUMENT PANELUpdate on the 3D Cockpit Visualization24/4/20194.5Halanda
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Cabin Doors: (45-02 -> 45-03)25/4/20195HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Cabin Doors: (45-02 -> 45-05)26/4/20196.5HalandaBenedikovic
FINISH KIT / ENHANCEMENTS45 CABIN DOORS & TRANSPARENCIES / PLANEAROUND DOOR LOCKING SYSTEM(45) Cabin Doors & PlaneAround Door Locking Mechanism: (45-02 -> 45-05) + PlaneAround Door Locking System27/4/20196.5HalandaBenedikovic
ENHANCEMENTS BERINGER BRAKES & PARKING BRAKEParking Brake Sensor Final Installation28/4/20193.5HalandaBenedikovic
FINISH KIT46 ENGINE MOUNT & LANDING GEAR(46) Initial line up and mounting of the Engine Mount: (46-2) …with some initial difficulties to line up the holes29/4/20192.25HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Cabin Doors: Glueing together both halves.29/4/20193.5HalandaBenedikovic
INVENTORYInventory: Wheelen Dome Lights: The first is planed to light up the cabin, the second to light up the baggage compartment.30/4/20190.25HalandaBenedikovic
ENHANCEMENTS MISCSealing the Firewall with RTV30/4/20190.5HalandaBenedikovic
ENHANCEMENTS OP48 AHRS BRACKET(OP-48) AHRS BRACKET mount: The bracket will be utilized to hold the DME & TXPD external modules and some more items.1/5/20192.75HalandaBenedikovic
FUSELAGE KIT31 UPPER FWD FUSELAGE ASSEMBLY(31) FWD Fuse Top riveted to Fuselage: (31-9) Had to use a spacer on the left half to avoid folded skin.2/5/20192.25HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELFlap Handle repainted2/5/20190.75HalandaBenedikovic
INVENTORYInventory: Engine Heating Pads 220V, various screws, BOELUBE Paste, Ignition Switch with keylocks3/5/20190.5Halanda
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Cabin Doors: (45-02 -> 45-05)4/5/20193.5HalandaBenedikovic
ENHANCEMENTS OVERHEAD CONSOLE / SYSTEMNACA Air Inlets for Overhead Tunnel4/5/20193HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELKeyed Ignition Switch 3D model added to Panel Visualization4/5/20191.5HalandaBenedikovic
ENHANCEMENTS MISCFirewall Heat & Soundproofing Foil applied5/5/20191.5HalandaBenedikovic
FINISH KIT50 CABIN HEAT AND VENTILATION(50-2) Heater Ducts installed6/5/20191HalandaBenedikovic
FINISH KIT46 ENGINE MOUNT & LANDING GEAREngine Mount6/5/20190.75HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIESCabin Doors: Working on cabin doors..7/5/20195.5HalandaBenedikovic
INVENTORYINVENTORY: Except for glecos and some chemicals, I received the door rubber seals.. Trimlok 100 series: 3100B3X1/4A13/5/20190.5Halanda
ENHANCEMENTS / FUSELAGE KITOVERHEAD CONSOLE/SYSTEM / 43 CABIN COVEROVERHEAD CONSOLE: Preparation for gluing in the Overhead Console15/5/20197.5HalandaBenedikovic
ENHANCEMENTSOVERHEAD CONSOLE/SYSTEMOVERHEAD CONSOLE: glued in..: Overhead Console glued in including left and right conduit.16/5/20194.5HalandaBenedikovic
ENHANCEMENTSOVERHEAD CONSOLE/SYSTEMSun Shields & Conduits to Overh. Console17/5/20195.5HalandaBenedikovic
ENHANCEMENTSOVERHEAD CONSOLE/SYSTEMConduits / Overhead Console20/5/20195.25HalandaBenedikovic
ELECTRICAL & AVIONICSANTENNASTop Mounted Antennas: ..installed21/5/20193HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Cabin Doors22/5/20196.5HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Cabin Doors: Right door and cabin will need better alignment..28/5/20197.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYInterior Color & Leather pick: Looking for the right interior colors to match the interior handles and Aerosport panels + leather choice.17/6/20192.25Halanda
ENHANCEMENTS / FUSELAGE KITOVERHEAD CONSOLE / SYSTEM / 43 CABIN COVER(43) Match Drilling Cabin Cover: Match drilling the cabin cover with the Overhead Console8/7/20191.25HalandaBenedikovic
ENHANCEMENTSMISCDoor Seals: Fitting and trimming the door seals.11/7/20196.75HalandaBenedikovic
FINISH KIT / ENHANCEMENTS45 CABIN DOORS & TRANSPARENCIES / PLANEAROUND DOOR LOCKING SYSTEM(45) Door Handles & Mechanism: 45-10 -> 45-1412/7/20197.5HalandaBenedikovic
FINISH KIT / ENHANCEMENTS45 CABIN DOORS & TRANSPARENCIES / PLANEAROUND DOOR LOCKING SYSTEM(45) Door Handles & Mechanism: 45-10 -> 45-1413/7/20196.25HalandaBenedikovic
FINISH KIT / ENHANCEMENTS45 CABIN DOORS & TRANSPARENCIES / PLANEAROUND DOOR LOCKING SYSTEM(45) Door Handles & Mechanism: 45-10 -> 45-1417/7/20194.5HalandaBenedikovic
FINISH KIT / ENHANCEMENTS45 CABIN DOORS & TRANSPARENCIES / PLANEAROUND DOOR LOCKING SYSTEM(45) Door Handles & Mechanism: 45-10 -> 45-1719/7/20193.25HalandaBenedikovic
ENHANCEMENTSMISC. / OVERHEAD CONSOLE / SYSTEMBaggage Light Installation: Model: Whelen 708130722/7/20190.75HalandaBenedikovic
FINISH KIT / ENHANCEMENTS / FUSELAGE KITMISC. / CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43)(45) Doors and Door Seals: Making a bed of epoxy for the the door seals and epoxying the delrin guides in place on the doors.23/7/20197.5HalandaBenedikovic
FINISH KIT / ENHANCEMENTS / FUSELAGE KITMISC. / CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43)(45) Doors and Door Seals: Right epoxy bed is finished, now on to the left side..26/7/20196.25HalandaBenedikovic
ENHANCEMENTSOVERHEAD CONSOLE/SYSTEM / ELECTRICAL CONDUITSCabin Top Conduits: Fine tuning the cabin top’s corrugated conduit covers.30/7/20194.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYCabin Top furnishing: Preparing/trimming the laminated interior parts for furnishing the cabin top.1/8/20191.75HalandaBenedikovic
ENHANCEMENTS / FUSELAGE KITOVERHEAD CONSOLE/SYSTEM / 43 CABIN COVER(43) Cabin Cover & Overhead Console System: Filling and sanding the cabin top inside + fabricating a laminated cover for the Center Cabin Brace.3/8/20195.75HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Gas Strut Installation: 45-16 + door attaching brackets modified12/8/20193.5HalandaBenedikovic
FUSELAGE KIT / PAINT/FURNISHING/UPHOLSTERY33 BAGGAGE AREA / 43 CABIN COVERSpray painting with interior color: Spray painting the Cabin Cover/Top and other parts with interior color.14/8/20191.5HalandaBenedikovic
FUSELAGE KIT43 CABIN COVER(43) Cabin Cover mating with Fuselage: 43-4 -> 43-7 Final Fitting the Cabin Cover on the Fuselage + Windshield alignement15/8/20198.25HalandaBenedikovic
FUSELAGE KIT43 CABIN COVER(43) Cabin Cover mating with Fuselage: 43-4 -> 43-716/8/20196.5HalandaBenedikovic
FINISH KIT / PAINT/FURNISHING/UPHOLSTERY45 CABIN DOORS & TRANSPARENCIES(45) Preparing for Windshield installation: 45-18 -> 45-19 & creating template for the shield leather cover.19/8/20191.5HalandaBenedikovic
PAINT/FURNISHING/UPHOLSTERYGlareshield paint: 1 layer of epoxy primer + RAL 9017 Matte Black20/8/20190.25HalandaBenedikovic
FINISH KIT / FUSELAGE KIT45 CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43) (45) Cabin Cover & Doors + Door sills: The door sills are carbon fiber and come from Aerosport. Building covers for the door hinges..21/8/20193.75HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Door hinge covers22/8/20192.5HalandaBenedikovic
FINISH KIT / ENHANCEMENTS45 CABIN DOORS & TRANSPARENCIES / ANDAIR OIL SEPARATOR(45) Door hinge covers & Oil Separator Mount: Andair Oil Separator Mount on the firewall next to the Brake Fluid Reservoir.24/8/20193.75HalandaBenedikovic
FUSELAGE KIT43 CABIN COVER(43) Center Cabin Brace: Mounting the Center Cabin Brace in position..27/8/20191.25HalandaBenedikovic
ENHANCEMENTSANDAIR OIL SEPARATORAndair Oil Separator Mount: One more additional support bracket on the upper back side of the separator.28/8/20191.75HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Door gaps & rear windows: Adjusting the door gaps and attaching the rear pax windows with Lord Adhesive (7545A/E).2/9/20194.75HalandaBenedikovic
INVENTORYINVENTORY: USB Charging Ports: by CommitLift: http://commitlift.com/USBASinstructions.pdf2/9/20190.25Halanda
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Door Gaps: ..working on door gaps3/9/20194.25HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Door Gaps5/9/20196.5HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Windows: 45-18 -> 45-19 Glueing in pax windows and windshield. Checking clearance/depth of the Overhead Panel.9/9/20197.5HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Windshield: 45-18 -> 45-1910/9/20195.5HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Windshield: 45-18 -> 45-1912/9/20192.75HalandaBenedikovic
FINISH KIT / INVENTORY45 CABIN DOORS & TRANSPARENCIES(45) Windshield + INVENTORY: 45-18 -> 45-19 Received the 12V power plug -it’s intended for the baggage compartment.13/9/20193HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Windshield: 45-18 -> 45-1914/9/20192.75HalandaBenedikovic
FINISH KIT / FUSELAGE KIT45 CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43)(45) Cabin Top tuning & Windshield: Tuning the cabin top’s B pillars to match the door’s curvature and works on the windshield according to plans..15/9/20196.25HalandaBenedikovic
PAINT/FURNISHING/UPHOLSTERYUpholstery professional visit: Today Peter Skrabalek -an upholstery professional and glider pilot visited our Skunk works to check what can be done with the seats and other interior details.. 16/9/2019
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Windows: Glueing in a door window, working on the windshield and fine tuning/sanding the gaps on the pax windows.19/9/20194.5HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Door Windows & Windshield20/9/20195.5HalandaBenedikovic
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) Windows: All windows glued in place..21/9/20191.25HalandaBenedikovic
FUSELAGE KIT43 CABIN COVER(43) Filling transitions between fuselage and Cabin Cover22/9/20198.5HalandaBenedikovic
PAINT/FURNISHING/UPHOLSTERYFirst carpets are finished: These belong to the baggage compartment, the actual color is black. Thanks to Stefan Michalicka who did a fantastic job.23/9/2019
FINISH KIT45 CABIN DOORS & TRANSPARENCIES(45) More fiberglass around windows: Laying some more fiber around the windows to smooth the transitions..23/9/20194.5HalandaBenedikovic
PAINT/FURNISHING/UPHOLSTERYTrimming carpets: Fine tuning the carpet edges to get a proper fit on the floor. Stefan at work..24/9/20193.5HalandaBenedikovic
FINISH KIT / FUSELAGE KIT45 CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43)(45) Trimming gaps and transitions: ..never ending story! We wish Vans would deliver a much better fiberglass components. You literally spend weeks with filling, sanding, trimming..24/9/20194.5HalandaBenedikovic
FINISH KIT / FUSELAGE KIT45 CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43)(45) Trimming gaps and transitions: ..same story today25/9/20197HalandaBenedikovic
FINISH KIT / ENHANCEMENTS46 ENGINE MOUNT & LANDING GEAR / BERINGER BRAKES & PARKING BRAKE(46) Landing Gear BERINGER: A deviation from Vans plans using the BERINGER wheels and brakes RV-10 kit. Getting ready for installation.28/9/20193.5HalandaBenedikovic
INVENTORYINVENTORY Baggage Net and engine mount covers: Today I received the baggage net, both engine mount carbon covers and a handle cover replacement (got damaged during installation). The last 2 items came from AeroSport – super friendly customer service!30/9/20190.25Halanda
FINISH KIT / FUSELAGE KIT45 CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43) (45) More filling and sanding..2/10/20198.75HalandaBenedikovic
FINISH KIT / FUSELAGE KIT45 CABIN DOORS & TRANSPARENCIES / 43 CABIN COVER(43) (45) More filling and sanding..3/10/20199HalandaBenedikovic
ENHANCEMENTS / INVENTORYINSTRUMENT PANELLaser etched switches: Today I received my laser etched switches for the instrument panel from http://techmind.sk/en/ Mr. Martyscak, the owner of Techmind did a wonderful job. I’m very happy with the results.. 4/10/2019
PAINT/FURNISHING/UPHOLSTERY / FUSELAGE KIT43 CABIN COVERSpray painting the Cabin Cover and Fuse: 2K Epoxy Primer8/10/20195.5HalandaBenedikovic
ENHANCEMENTS / FUSELAGE KITBERINGER BRAKES & PARKING BRAKE / 43 CABIN COVER(43) Cabin Cover finished: voilà10/10/20197.75HalandaBenedikovic
ENHANCEMENTS / FINISH KITBERINGER BRAKES & PARKING BRAKE / 46 ENGINE MOUNT & LANDING GEAR(46) Main & Nose Gear: Right landing gear incl. wheel was attached without issues but the pin on the left side wouldn’t go in and eventually bent. During removal the axle was damaged so I ordered a new one including 2 new pins from BERINGER. Forward leg mounted with rubber dampeners with no issues. We had to utilize a temporary support for the left side until we get replacement parts from BERINGER.13/10/20197HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Starting works on the Wheel Fairings15/10/20196.75HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Wheel Fairings17/10/20197.75HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Gear Legs and Wheel Fairings18/10/20196.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Gear Legs and Wheel Fairings24/10/20198.75HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELSwitch & Pushbutton backlighting: Checking the switch backlighting with some 9V batteries. The pushbutton’s text will be visible when backlit only.24/10/20190.5Halanda
FINISH KIT / ENHANCEMENTS48 GEAR LEG & WHEEL FAIRINGS / BERINGER BRAKES & PARKING BRAKE(48) Left Main Gear attached: The spare parts from BERINGER arrived so we were able to mount the left leg with wheel and did some additional work on the fairings.29/10/20194HalandaBenedikovic
FINISH KIT / ENHANCEMENTS48 GEAR LEG & WHEEL FAIRINGS / BERINGER BRAKES & PARKING BRAKE(48) Forward leg and wheel fairings31/10/20197.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Finding the axes: For a proper wheel pants alignment we raised the main gears and drew axes on the floor..2/11/20193HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Front leg and wheel fairings3/11/20197.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Main Wheel Fairings: Aligning the main wheel fairings..4/11/20196HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Main Wheel Fairings5/11/20196.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Main Wheel Fairings: Slight deviation from plans: Fabricating a V-bracket to better support the fairing; saw this solution at some other builder’s website and liked it. The single bolt hole will be filled when finished.6/11/20195.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Main Wheel V-brackets: Riveted and epoxied in place..7/11/20193.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Wheel Fairings8/11/20197.75HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Leg and Wheel Fairings9/11/20196HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings: 48-10 -> 48-1211/11/20195.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings13/11/20193.5HalandaBenedikovic
PAINT/FURNISHING/UPHOLSTERY / FUSELAGE KITCarpets: Verifying the carpets fit and checking CG with some live weight in the baggage area 😀 I,ll have to cut out some openings for the heater outlets..16/11/20190.75HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings: Works on the intersection fairings continue and we ran into a clearance issue with the upper intersection fairing and the ANDAIR gascollators on each side. We’ll have to sort that out later..17/11/20191.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANEL3D design for the Instrument: I positioned a piezzo buzzer (free dowload from Grabcad) behind the instrument panel. This one will work as a backup and will be connected to the original Vans stall switch. The other design involves an external VR by B&C. It’s not a 100% accurate model but it’s good enough to check if you have enough space behind the panel.. Lastly I needed to move 2 screw holes on the left Aerosport instrument panel insert to accommodate the EFIS’s nutplates.17/11/20196.25HalandaBenedikovic
ENHANCEMENTSTOW BAR TAILCONE STORAGETow Bar Mount in the tailcone: Mock-up of the Tow Bar Mount..18/11/20194.75HalandaBenedikovic
ENHANCEMENTSTOW BAR TAILCONE STORAGETow Bar Mount: Fork holder finished -riveted, made of Carbon Fiber and reinforced with bracket.19/11/20195.25HalandaBenedikovic
ENHANCEMENTSTOW BAR TAILCONE STORAGETow Bar Mount finished: Inspired by PILATUS PC6!20/11/20192HalandaBenedikovic
INVENTORYINVENTORY Milw. Scissors, Altn Door Spring, Rammount: The Alternate Air Door Spring is actually a C182 part nr. S2952-1520/11/20190.25HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings21/11/20193.5HalandaBenedikovic
ENHANCEMENTSMISC.12V plug & light push button: Installation of the 12V plug and baggage light push button. 22/11/20195HalandaBenedikovic
ENHANCEMENTS / ELECTRICAL & AVIONICSACCESS/INSPECTION COVERS / EXTERNAL POWER CONNECTORBaggage Bulkhead Door & Ext PWR Plug: Installing the baggage bulkhead door holder and the External Power Plug is now connected to the structure to avoid unintended loss in the tailcone or even worse: flight controls blockage.25/11/20193.25HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings28/11/20193.5HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings30/11/20193HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings5/12/20194HalandaBenedikovic
WELCOMESituation Overview11/12/20190.5HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELPush Buttons & Indicators: Push Buttons & Indicators. Some of them will be readable only when backlit, that’s the idea. The push buttons can operate as discrete inputs for various systems (e.g. G3X touch to inhibit ESP-X or manually activate display Reversion).. There is a typo on the DSPL RERVERS button and I’ll have a new switch engraved. Push Buttons and indicators are high quality, made in Germany. Momentary or ON/OFF functions available.13/12/20191Halanda
FINISH KIT47 SPINNER & COWLING47-2 -> 47-3 Spinner Back Plate preparation, priming and assembly.
47-10 Works on Oil Door.
28/12/20193.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47 Various works on the cowl.29/12/20192.25HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-10 Oil Door30/12/20192.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-10 Oil Door6/1/20202HalandaBenedikovic
FINISH KIT48 GEAR LEG & WHEEL FAIRINGS(48) Intersection Fairings7/1/20203.75HalandaBenedikovic
INVENTORYSTRATUS USBs14/1/20200.1HalandaSTRATUS USBs
PAINT / FURNISHING / UPHOLSTERYInstalling forward Aerosport Interior Side Panels.16/1/20205.5HalandaBenedikovic
ELECTRICAL & AVIONICS /
ENHANCEMENTS
INTERIOR LIGHTSA friend 3d printed a bracket to hold to mount the compass. Tailcon lighitng with 2 small individual LEDs installed. 16/1/20202.25HalandaBenedikovic
ENHANCEMENTSSUN SHIELDShttp://www.aviatorshop.eu/RV-10/2020/04/30/2012020-sun-shields/20/1/20202.75HalandaBenedikovic
INVENTORYANDAIR CHECK VALVES for fuel tank breathers ANDAIR DV125 Drain Valves for fuel tanks to replace original Vans drain valves.21/1/20200.1Halanda
PAINT / FURNISHING / UPHOLSTERYTrimming and attaching the rear Aerosport interior panels.22/1/20206HalandaBenedikovic
ELECTRICAL & AVIONICSMISCInstalling the doors closed limit switches. Panasonic AZ7120CE26/1/20204.75HalandaBenedikovic
ENHANCEMENTS /
FUSELAGE KIT
38 Rudder Pedals & Brake System /
BERINGER Brakes & Parking Brake
Filling the BERINGER brake system with RADCOLUB FR257 (MIL-PRF-87257) fluid. +looking for potential leaks -found 328/1/20202.5HalandaBenedikovic
FUSELAGE KIT43 CABIN TOPFiller and sanding the front A pillars on cabin top to accommodate the front Aerosport side panels.31/1/20204.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYLast trimming and attaching the forward Aerosport Interior Panels.2/2/20202.75HalandaBenedikovic
ENHANCEMENTSINTERIOR LIGHTSWheelen LED - Baggage Light -test performed3/2/20200.25HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELWet Compass blind riveted to the Center Cabin Brace (WD-1043)6/2/20200.5HalandaBenedikovic
INVENTORYAMPLOC Hall Effect Current Sensors Headrests for rear seats7/2/20200.25Halanda
ENHANCEMENTSMISCForward Harness Holder Brackets. These are being designed to hold the forward shoulder harnesses on top when not in use.11/2/20202.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYMichal, (the upholstery specialist) is working on the forward seats.15/2/2020
ELECTRICAL & AVIONICSMISCFabricating a removable contactor bracket for 2 contactors in the tailcone section.15/2/20203.1HalandaBenedikovic
ELECTRICAL & AVIONICSINSTRUMENT PANELRelabeled the BACKUP switch into ESS to make it more obvious for pilots that this switch feeds the ESSENTIAL BUS and its components. So far, 3D model only.16/2/20200.5Halanda
PAINT / FURNISHING / UPHOLSTERYHeadrests for rear pax installed19/2/20202.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYInterior Paint3/3/20205HalandaBenedikovic
INVENTORYSTATIC WICKS DD-1W with B-4 BASE4/3/20200.1Halanda
PAINT / FURNISHING / UPHOLSTERY
ENHANCEMENTS
PLANEAROUND DOOR LOCKING SYSTEMInstalling Door Sills from Aerosport and PlaneAround central door locking safety mecanism.4/3/20204.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYForward Seats Progress -Ready for testing.. 13/3/2020
PAINT / FURNISHING / UPHOLSTERYFwd Gear Fork anodized15/3/20202HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYDoor Paint -Found some spots that had to be redone.16/3/20203.75HalandaBenedikovic
INVENTORYFWFD KIT Inventory + Engine and Prop20/3/20206.25HalandaBenedikovic
INVENTORYGIGAVAC Contactors GX11SA25/3/20200.1HalandaBenedikovic
FIREWALL FORWARDFF1-5 ENGINE INSTALLATIONInstalling the IO54026/3/20202.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYTesting the seat foams26/3/20200.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYInterior Paint (doors)28/3/20202HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING(47) SPINNER & COWLING29/3/20204.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING(47) SPINNER & COWLING30/3/20204HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling31/3/20206.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling Modification on the bottom cowls -will use two fasteners per side.1/4/20202HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling2/4/20206.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling3/4/20203.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling4/4/20204HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling +starter removal for SALE! (sold)5/4/20203.75HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling Louvers were alodined.8/4/20205.75HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling10/4/20203.5HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-20 Starting works on the baffles.11/4/20202.1HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-2012/4/20203.5HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-2013/4/20205.25HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-2014/4/20204.5HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-2015/4/20203.75HalandaBenedikovic
INVENTORYFlap handle came back from friend’s dad who made this perfect label on the handle to identify the switch function. I’ll put some clear coat on to protect the text.. Thank you Rastik! 😉 15/4/20200.1HalandaFLAP HANDLE RECEIVED LABELED
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-20 + left magneto removed FOR SALE!18/4/20203.5HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEFF2-1 -> FF2-20 Trimming horizontal pins and various adjustments..19/4/20204.75HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APFAB (AIR BOX) 22/4/20202.5HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APFAB (AIR BOX) 23/4/20203HalandaBenedikovic
INVENTORYAIR AVIONICS AT1 & SEAT LEATHER24/4/20200.2HalandaAIR AVIONICS AT1 & SEAT LEATHER
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APFAB (AIR BOX) 24/4/20202.75HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APFAB (AIR BOX) & Air Inlet25/4/20201.5HalandaBenedikovic
ELECTRICAL & AVIONICSMISCCONTACTORS INSTALLATION25/4/20202.5HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APAir Inlet in the cowling:26/4/20201.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYHARNESS COLOR: Looking for the right belts and harnesses color to complement the cockpit interior color.27/4/20200.5Halanda
ELECTRICAL & AVIONICS220V OIL PREHEAT SYSTEMInstalling the low profile IP65 rated 220V socket for the EZ-HEAT oil preheat system. Plug and socket feature a lockable system which can be connected and disconnect hot / under load.28/4/20200.5HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLEAIR SEAL FABRIC29/4/20203.75HalandaBenedikovic
FINISH KIT47 SPINNER & COWLINGScrew fasteners instead of bottom cowl hinges. This mod will make removing and attaching the bottom cowl easier. +1 shot behind the bulkhead..30/4/20201.5HalandaBenedikovic
FINISH KIT47 SPINNER & COWLING47-4->47-12 Cowling +poor man’s ‘LightBox’30/4/20200.75HalandaBenedikovic
ENHANCEMENTSANDAIR Oil SeparatorPosition of the collector has changed for better access. Custom hoses added -might need to modify later with second alternator and oil filter adapter installed.4/5/20204.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYValve Covers Paint Removal6/5/20201HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYFF2 COWLE BAFFLEBaffles alodined and Valve Covers Chrome-plated7/5/20204.75HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APAluminium plated fixated below the air filter to avoid the air filter rubbing through the air box.9/5/20201.25HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM & FAB 540 APFAB modified to use an Automatic Alternate Air Door sytem. No pilot action required.13/5/20201.75HalandaBenedikovic
FIREWALL FORWARDFF2 COWLE BAFFLE(FF2-17) Tensions springs instead of tension rods. This section has been modified to use tension springs instead of tension rods. For easy of operation/removal/installation.13/5/20202.25HalandaBenedikovic
FIREWALL FORWARDFF3 CONTROL CABLESFF3 Installing Push/Pull Control Cables13/5/20201.5HalandaBenedikovic
ELECTRICAL & AVIONICSMISCNew Contactor Holder Bracket16/5/20202.75HalandaBenedikovic
FIREWALL FORWARD /
ELECTRICAL & AVIONICS
FF5 OIL SYSTEM
ELECTRICAL & AVIONICS
B&C Oil Filter Adapter, Starter & Alternators21/5/20202.25HalandaBenedikovic
ELECTRICAL & AVIONICSSUREFLY Electronic Magneto SUREFLY Electronic Magneto22/5/20201.25HalandaBenedikovic
FIREWALL FORWARDFF4 FUEL SYSTEM, FF5 OIL SYSTEMOil & Fuel Hoses22/5/20202.75HalandaBenedikovic
ELECTRICAL & AVIONICSExternal Power Connector, AntennasFlarm Antenna, EXT PWR CB installed25/5/20202HalandaBenedikovic
FIREWALL FORWARDFF6 EXHAUST SYSTEM, ELECTRICAL & AVIONICSSpark Plugs Wiring & Exhaust installed28/5/20202.5HalandaBenedikovic
FIREWALL FORWARD47 SPINNER & COWLINGCowling29/5/20204HalandaBenedikovic
FIREWALL FORWARD47 SPINNER & COWLINGCOWLING30/5/20203.5HalandaBenedikovic
FIREWALL FORWARDFF1 ENGINE INSTALLATIONPROP GOVERNOR INSTALLATION6/6/20202.5HalandaBenedikovic
ELECTRICAL & AVIONICS220V OIL PREHEAT SYSTEME-Z Heat Preheat Pads7/6/20203.75HalandaBenedikovic
FIREWALL FORWARDFF3 CCONTROL CABLESControl Cables installation8/6/20205.75HalandaBenedikovic
FIREWALL FORWARD47 SPINNER & COWLINGCowling9/6/20204.5HalandaBenedikovic
FIREWALL FORWARDFF6 EXHAUST SYSTEMFF6 EXHAUST SYSTEM10/6/20203.75HalandaBenedikovic
FIREWALL FORWARDFF3 CCONTROL CABLESFF3 Control Cables10/6/20203HalandaBenedikovic
ELECTRICAL & AVIONICSArtex 345 ELT installation11/6/20202.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYFront Seats Upholstery in progress12/6/2020
FIREWALL FORWARD47 SPINNER & COWLINGCOWLING13/6/20204HalandaBenedikovic
WINGS KIT24 WING TIPWingtip Light Lense15/6/20203HalandaBenedikovic
FIREWALL FORWARD47 SPINNER & COWLINGCOWLING16/6/20204HalandaBenedikovic
INVENTORYINVENTORY Pins & CO Detector25/6/20200.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYFront Seats: lower part finished26/6/2020
ELECTRICAL & AVIONICSDefog Fans27/6/20201.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYFront Seats: Headset Hangers28/6/20202HalandaBenedikovic
Overhead Console / SystemOverhead panel28/6/20204.25HalandaBenedikovic
FINISH KIT49 SEATS & SEAT BELTSFront Seat Rails29/6/20201.75HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYHeadset Hangers & Aerosport Seat Handle29/6/20204HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstalling AT-1 Traffic & both Regulators3/7/20201.5HalandaBenedikovic
INVENTORYINVENTORY: G5 GPS Antenna, Coup holders for rear seats, Magneto RPM sensor, Updated 75PSI Fuel Pressure Transducer11/7/20200.25HalandaBenedikovic
Overhead Console / System, Interior LightsOverhead Panel lights20/7/20203HalandaBenedikovic
FIREWALL FORWARD
ELECTRICAL & AVIONICS
FF4 FUEL SYSTEMEngine Sensors: FT-60 (RED BOX) Fuel Flow Metering Unit, Fuel Press. Sensor, MAP Sensor, Oil Press Sensor26/7/20204.75HalandaBenedikovic
ELECTRICAL & AVIONICSTrim Motors Wiring: Using DTM connectors.31/7/20202.75LoyBenedikovic
ELECTRICAL & AVIONICSStatic Wicks installation & Ground Points5/8/20203.5HalandaBenedikovic
ELECTRICAL & AVIONICSAntennasAT-1 Firewall Antenna PassThrough7/8/20201HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel MockUp: For Avionics Installation..9/8/20205.5HalandaBenedikovic
ELECTRICAL & AVIONICSTrim Motors/Servos wiring: DTM connectors in use.10/8/20201.5LoyBenedikovic
INVENTORYINVENTORY Avionics14/8/20201HalandaBenedikovic
ELECTRICAL & AVIONICS,
PITOT STATIC SYSTEM
Instrument PanelAir Connection to and via GSU25: AOA, Static and Total Pressure lines29/8/20202HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelKey Switch Installation31/8/20200.25HalandaBenedikovic
ELECTRICAL & AVIONICSWiring & Electrical5/9/20204.5LoyBenedikovic
ELECTRICAL & AVIONICSAntennasElectrical & Wiring (Antennas)6/9/20208LoyBenedikovic
PAINT / FURNISHING / UPHOLSTERYFront Seats Upholstery: Front Seats Upholstery finished. 10/9/2020HalandaBenedikovic
SERVICE BULLETINSService Bulletin SB 18-03-3014/9/20204HalandaBenedikovic
ELECTRICAL & AVIONICSHelping hands by Barbora -student from Faculty of Aeronautics18/9/20205LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelAvionics Installation / Wiring19/9/20208LoyBenedikovic
ELECTRICAL & AVIONICSAvionics Installation / Wiring27/9/20208.5LoyBenedikovic
ELECTRICAL & AVIONICSAvionics Installation / Wiring7/10/20208LoyBenedikovic
ELECTRICAL & AVIONICSAvionics Installation / Wiring10/10/20207.5LoyBenedikovic
ELECTRICAL & AVIONICSAvionics Installation / Wiring14/10/20208LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel Inserts15/10/20203HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel Inserts21/10/20208HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel Inserts25/10/20208HalandaBenedikovic
ELECTRICAL & AVIONICSAvionics Installation / Wiring: DME connector KN63 and Alternator Connector replacement6/11/20202LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel11/11/20209HalandaBenedikovic
MISCCovers & Plugs arrived20/11/20200.25HalandaBenedikovic
ELECTRICAL & AVIONICSDME KN63 Connector Wiring5/12/20200.75LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel Inserts7/12/20208HalandaBenedikovic
ELECTRICAL & AVIONICSElectrical / Wiring / Avionics9/12/20208LoyBenedikovic
FIREWALL FORWARDFF6 EXHAUST SYSTEMFF6-4 EXHAUST SYSTEM: Heating /Vent Scat9/12/20201HalandaBenedikovic
ENHANCEMENTS220V OIL PREHEAT SYSTEMOil Preheat System / Plug Cover: Designing the PreHeat Plug Cover13/12/20204.5HalandaBenedikovic
ELECTRICAL & AVIONICSGMU11 MagnetoMeter Bracket14/12/20202.75HalandaBenedikovic
ELECTRICAL & AVIONICSStarter Engaged Warning Relay: Mounted on the firewall.15/12/20202.5HalandaBenedikovic
ELECTRICAL & AVIONICSElectrical / Wiring / Avionics18/12/20206LoyBenedikovic
ENHANCEMENTSPlaneAround Door Locking SystemPlanearound Door Locking System31/12/20204.5HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelElectrical / Wiring / Avionics: Rocker Switches backlight wiring..11/1/20215.75LoyBenedikovic
ELECTRICAL & AVIONICSOAT probe and Stall Warn installation12/1/20212.75LoyBenedikovic
ELECTRICAL & AVIONICSElectrical / Wiring: Circuit Breaker Panel20/1/20217.75Loy, HalandaBenedikovic
ELECTRICAL & AVIONICSElectrical / Wiring: Flap Position Sensor, Ground Termination/Junction Boxes..27/1/20218LoyBenedikovic
ELECTRICAL & AVIONICSExternal Power ConnectorElectrical / Wiring: Wing root holes for connectors; Alternator 1 and Starter Wiring; Preheat System plug cover, Rudder Trim Switch wiring; Fuel Sensor Wiring, MASTER and ESS switches31/1/20217.5LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelElectrical / Wiring: Annunciator Test Switch; Instrument Mockup Panel6/2/20216.75LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelElectrical / Wiring Avionics: Wiring with predetermined wire lengths:10/2/20218.5LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelElectrical / Wiring: Audio Wires; Avionics Wiring20/2/20219LoyBenedikovic
ELECTRICAL & AVIONICSInterior LightsDome Light Timer: Dome Light Timer prototype9/3/20213LoyBenedikovic
ELECTRICAL & AVIONICS220V OIL PREHEAT SYSTEMElectrical / Wiring: Prewired cables go behind the panel.. Diode block; Wing Root Wiring; Amplock AMP meter10/3/20217.5LoyBenedikovic
ELECTRICAL & AVIONICSGrip Wiring17/3/20216LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel Wiring25/3/20216.5LoyBenedikovic
ELECTRICAL & AVIONICSInstrument PanelInitial Avionics Startup: Initial Avionics startup. No faults26/3/20211HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelAvionics Setup: Setting up the sensors and limitations..30/3/20214HalandaBenedikovic
ELECTRICAL & AVIONICSDatabase Updates3/4/20213HalandaBenedikovic
Workshop, TransportsTrial Move out of the Workshop3/4/20210.5Benedikovic
ELECTRICAL & AVIONICSAvionics Setup / Configuration: Audio Panel does not respond when configured to correct GMA345 model..6/4/20214.5HalandaBenedikovic
SERVICE BULLETINSService Bulletin SB-0000212/4/20213.5HalandaBenedikovic
ELECTRICAL & AVIONICSAvionics / Wiring14/4/20218.75LoyBenedikovic
ELECTRICAL & AVIONICSAntennasCOM 2 Antenna14/4/20211.5LoyBenedikovic
ELECTRICAL & AVIONICSAvionics Configuration16/4/20216HalandaBenedikovic
ELECTRICAL & AVIONICSInventory: GNC 255 Backplate and DTM Connector20/4/20211HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYRear Seat Base Plate Construction24/4/20213.5HalandaBenedikovic
ELECTRICAL & AVIONICSAvionics / Wiring: Tailcone Wiring29/4/20213.75LoyBenedikovic
FAB 540 AP, ENHANCEMENTSUpdate of the Automatic Alternate Door29/4/20212HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelCOM / NAV 2 Installation & Wiring Check29/4/20213LoyBenedikovic
ELECTRICAL & AVIONICS, Workshop, Transports, 44 Wing AttachementMoving to the hangar & Wings installation: Electrical / Avionics Guru/Maestro Jaro Loy on picture.29/4/20211
ELECTRICAL & AVIONICSExterior LightsLanding Light & Pos. Lts Test30/4/20210.5LoyBenedikovic
ENHANCEMENTSCenter Console, ANDAIR Fuel SystemCenter Console with Fuel Selector1/5/20212HalandaBenedikovic
ENHANCEMENTSANDAIR Fuel SystemFuel Tank Alternate Air Valve: Check Valve from Andair installed. Opens automatically when the fuel intace becomes blocked to prevent fuel tank collapse.1/5/20211.5HalandaBenedikovic
EMPENNAGE KIT9 ElevatorsElevator Installation3/5/20211.75HalandaBenedikovic
BUILDER'S LOGBOOKCAA Visit4/5/2021
ELECTRICAL & AVIONICSInstrument PanelInstrument Panel Inserts: Custom made insert with description (Left Panel)5/5/2021
EMPENNAGE KIT7 Rudder, 12 Empenage FairingsRudder & Empenage Fairings6/5/20213.5HalandaBenedikovic
ELECTRICAL & AVIONICS
FIREWALL, FORWARD,
FINISH KIT
27 Firewall, Instrument Panel, 50 Cabin Heat & Ventilation, FF5 OIL SYSTEMPush&Pull Controls final installation: Rear Heat, Front Heat, Parking Brake, Oil Cooler Door12/5/20213HalandaBenedikovic
ELECTRICAL & AVIONICSWiring Tailcone & Overhead Panel14/5/20216LoyBenedikovic
FUSELAGE KIT43 Cabin CoverTailcone Fwd Top Skin16/5/20213.5HalandaBenedikovic
WINGS KIT22 FlapsFlaps Install18/5/20214HalandaBenedikovic
FUSELAGE KIT35 Access Covers and Floor Panels35-9 Mid Cabin Side Covers21/5/20212.25HalandaBenedikovic
First Refueling: Preparation for initial engine start.29/5/20210.5HalandaBenedikovic
1st Engine Start: Maestro himself before we pulled the RV-10 out of the hangar for the 1st engine start:30/5/20212HalandaBenedikovic
ENHANCEMENTS,
WINGS KIT
18 Fuel Tank, ANDAIR Fuel SystemFuel Breather Line1/6/20212HalandaBenedikovic
ENHANCEMENTS,
PAINT / FURNISHING / UPHOLSTERY
Center ConsoleArmrest Installation2/6/20210.25HalandaBenedikovic
FINAL PREPARATIONSCovers & Final Exterior Scan5/6/20210.5HalandaBenedikovic
PAINT / FURNISHING / UPHOLSTERYRear Seat Bank finished9/6/2021
ENHANCEMENTSPanel Inserts & Decals: Graphics & Final Products..10/6/20215.75HalandaBenedikovic
FINAL PREPARATIONSFlight Controls Lock: Initial design seems to work well except ailerons / flaps lock. We run into the danger of damage when selecting flaps above 15deg with the lock installed. Ailerons + Wing Tip makes more sense but the discharger is in the way – we will think it over.. Rudder & Elevator lock works very well.11/6/20215.5HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelG5 Static+Total Pressure Connections: Instrument Panel almost finished12/6/20217.75HalandaBenedikovic
WelcomeSun Shades: Sun Shades installed.18/6/20213HalandaBenedikovic
FINAL PREPARATIONSInitial Weighting: still paintless..24/6/20213HalandaBenedikovic
INVENTORYRudder Trim Springs Inventory24/6/20210.5Halanda
PAINT / FURNISHING / UPHOLSTERYRear Seat installed & brought to trial4/7/20211HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelCom / Nav 2 installed: GNC2553/8/20210.5HalandaBenedikovic
ELECTRICAL & AVIONICS /
FUSELAGE KIT
Instrument Panel, 39 Control SystemGrip Sticks installed25/8/20213.5HalandaBenedikovic
ELECTRICAL & AVIONICSInstrument PanelSMART GLIDE push button: Optional SMART GLIDE momentary push button.16/9/20211Halanda